Project Detail

Tedzani-4 HEPP is located on Shire River in Malawi which is in Africa continent. Intake structure will be integrated to an existing dam lake. The headrace length is 600 m and will divert flow to headtank. The length of penstock is 100 m. There will be one unit inside the powerhouse.


  • Investor
  • Çalık-Mitsubishi Enerji
  • Location
  • Malawi
  • Installed Power
  • 18.00 MW
  • Design Discharge
  • 53.5 m³/s
  • Net Head
  • 38.50 m
  • Contract Year
  • 2017
  • Services
  • FD
  • DeD
  • Progress
  • Processing